• Home
  • Portfolio
    • Higher Education
    • Student Housing
    • Pre K – 12 Education
    • Senior Living
    • Planning
  • Our Firm
    • About HPI
    • People
  • Career
    • Culture
    • Career Opportunities
  • Contact

Portfolio

Home>Portfolios>Downey USD – Rio San Gabriel Elementary School Modernization and Addition

Client:

Downey Unified School District

Project Description:

Rio San Gabriel Elementary School located in Downey, CA serves students TK-5th grade. The project scope includes a comprehensive modernization and addition to the elementary school campus including a new Main Entry and new Administration and Kindergarten Buildings.

Our approach includes successful implementation of a new Administration Building with a secured lobby that provides a single point of entry while creating a new school entry statement that enhances campus identity, the sense of arrival, and the architectural character of the school. Locate a new TK/Kindergarten Classroom Building and Play Yard that cohesively stitches within the overall campus site plan. Modernize and repurpose existing buildings to remain meet the educational program needs of the campus.

 

2023_03-River 2023_12-Innovation-Lab 2023_13-Library 2023_04-Branding
View All Work

Portfolio

  • Higher Education
  • Pre K – 12 Education
  • Student Housing
  • Senior Living
  • Planning
  • Our Firm
  • About HPI
  • People
  • Career
  • Culture
  • Career Opportunities
Contact

Newport Beach: 949.675.6442
San Diego: 858.203.4999
[email protected]

Connect
facebooklinkedininstagram
Get In Touch

SIGN UP FOR OUR NEWSLETTER!

  • This field is for validation purposes and should be left unchanged.

© 2025 HPI Architecture. All Rights Reserved.
Built by TinyFrog.