• Home
  • Portfolio
    • Education
    • Senior Living / Healthcare
    • Planning
  • Our Firm
    • About HPI
    • People
  • Career
    • Culture
    • Career Opportunities
  • Contact

Portfolio

Home>Portfolios>Sunrise Redwood City

Project name:

Sunrise Redwood City

Client:

Sunrise Senior Living

Project size:

78,900 SF

Project Description:

The project is a 90-unit residential care facility for the assisted living and involves the construction of a three-story, 78,900-square-foot building with underground parking.
The site location provided for constraints that evolved to design opportunities. The front of the site is located on a commercial street while the back butts up to a low-density residential area with a setback to provide a buffer for both the memory care and adjacent residential community as well as a garden space for the memory care to use. The dining room, activity room, and other spaces for social engagement are located on the front while the memory care facility is located on the backside to provide a quieter space. Vehicular circulation is divided to have guests and deliveries enter from the commercial front, with the residents entering off the back from the residential community side to provide less traffic for the low-density housing. Because of the site layout and limited outdoor space, we utilized the 2nd and 3rd floor spaces to provide roof top gardens.

Redwood_Photomatch_ElCamino01_01 Redwood_Photomatch_Markham_01 Redwood_CAM02_El-Camino_01 Redwood_CAM03_01
View All Work

Portfolio

  • Education
  • Senior Living / Healthcare
  • Planning
  • Our Firm
  • About HPI
  • People
  • Career
  • Culture
  • Career Opportunities
Contact

Newport Beach: 949.675.6442
San Diego: 858.203.4999
[email protected]

Connect
facebooklinkedininstagram
Get In Touch

SIGN UP FOR OUR NEWSLETTER!

  • This field is for validation purposes and should be left unchanged.

© 2019 HPI Architecture. All Rights Reserved.
Built by TinyFrog.